Working throughout Kent, Sussex, London, Surrey and the rest of the South of England, our earth retention and retaining structure erections are expertly applied by our team and often dovetail with other forms of ground stabilisation, strengthening and piling services, maximising developable space with safety and long term reliability to the fore.

A45 Cycle Bridge
Our specialist build teams undertook contract work for Civil Engineering contractor Interserve constructing reinforced soil embankments and abutment walls to form the cycleway approaches to new o...More Information
Overton
Infill stone was carefully selected and hand placed in the face of the gabion gravity retaining wall on this housing site for groundworks company Gracelands Limited. Geolex designed, suppl...More Information

Roedean
With available space on this site at a premium, and the need to re-use the chalk excavation arisings as engineered fill for the new earthwork terracing to form the proposed sports pitches, Geole...More Information

Innovative design and earth retention specific GI pays dividends
Reinforced concrete retaining walls with piled foundations were originally shown on the Engineering layout drawings for this Barratt Homes development site at Pan Meadows Isle of Wight for groundworke...More Information

Wood in the Woods
Timber crib gravity walling was chosen by our client Millgate Developments to form an earth retainer to a forested location at their prestigious new home development at Knowle Hill Park, Cobham, Surre...More Information

C Spencer Back on the Rails
Our Civil Engineering Director was invited to table suitable earth retention options for a number of Guildford to London Waterloo main line stations where platform extensions had already been construc...More Information

A13 Junction Improvements
The specialist construction of the first phase of reinforced soil modular block retaining walls at the A13/A1014 interchange at Stanford Le Hope, Essex was completed in 2013. The retaining walls and s...More Information

Trevereux Hill, Surrey
We were invited to provide design and project management for a gravity crib wall at our client Millgate Homes site in Trevereux Hill, Oxted. Due to the site topography, the crib wall was located immed...More Information

East - West Rail Link
Our engineering team was contracted to install an extensive Gabion Retaining wall as part of the prestigious East West Rail Link at Bicester for contractor Buckingham Group Civil Engineering Limited.More Information