Skip to content
  • TELEPHONE:
    01795 597571
  • EMAIL:

A45 Cycle Bridge

Back

A45 Cycle Bridge - Geolex and Geogrids

Our specialist build teams undertook contract work for Civil Engineering contractor Interserve constructing reinforced soil embankments and abutment walls to form the cycleway approaches to new overbridge on the A45 Rushden By Pass, Northamptonshire.

Split faced modular concrete blocks and both wraparound and steel faced reinforced soil systems were adopted throughout with latter forming the basis for future vegetative growth and a pleasing soft face landscaped finish.  

Stage 1
Stage 2
Stage 3
Stage 3
Stage 4
Stage 4
Stage 4
Stage 4
Stage 4
Top